Electrical and mechanical installation at the new Hearing and Balance project at Leicester General Hospital

Services we supplied:
  • Emergency Lighting
  • Fire Alarms
  • Industrial Electrical Installation
  • Interior Lighting
  • Mains Switchgear
Start Date:
01/05/2025
Completion Date:
Ongoing
Sector:
Health Services
Project Value:
£1,035,000

As part of the new hospital transformation programme managed by the University Hospitals of Leicester NHS Trust, the Hearing and Balance service from the Leicester Royal Infirmary (LRI) is being relocated to a new, purpose-built facility within the East Midlands Planned Care Centre.

The new facility at Leicester General Hospital will bring adult hearing services, balance and vestibular assessments, and hearing therapy together within a unified, modern clinical environment, providing enhanced support for patients and healthcare professionals.

With the dedicated Hearing and Balance Facility expected to launch later this year, main contactor Speller Metcalfe needed a sub-contractor who could support with all the essential electrical and mechanical installations.

With extensive experience working across the medical sector and NHS facilities, Fusion 360 was appointed to design and install the necessary systems supporting specialist healthcare services across the first-floor East and South Wings, together with associated second-floor and roof-level plant and services.

 

The challenge:

As a hospital environment, the new Hearing and Balance facility needed to prioritise safety, reliability and compliance with their electrical and mechanical systems.

Furthermore, the work was being carried out within the active Leicester General Hospital, meaning all installation activities needed to account for the surrounding buildings, ongoing hospital operations and the safety of nearby patients, staff and personnel.

Before the project could begin, these challenges would need to be addressed, maintaining rigorous workplace safety and ensure the new system adheres to regulations and standards required within a healthcare environment.

 

How we’ve helped:

Working to the specifications, schematics and coordinated drawings, the Fusion 360 team were able to successfully kickstart the delivery of a substantial mechanical and electrical package.

Our prior experience working within specialist clinical and healthcare facilities enabled us to carefully plan and coordinate the installation of complex systems within a live hospital environment, minimising disruption while maintaining high standards of safety and quality.

Working in close collaboration with the principal contractor, Speller Metcalfe, and the wider professional team, our team are installing the following electrical systems across occupied hospital wings:

  • LV sub-distribution
  • Primary and secondary cable containment
  • General lighting and emergency lighting
  • Small power installations
  • Fire alarm installation
  • Disabled WC alarm systems
  • Access control
  • Voice and data cabling
  • Earthing, bonding and medical earthing
  • Electrical design development
  • Testing and commissioning
  • Handover documentation and record drawings

As part of our mechanical installation, we are also installing:

  • Above-ground wastewater drainage
  • Domestic cold-water services
  • Domestic hot-water services
  • Low-temperature hot-water heating
  • Comfort cooling systems
  • Variable refrigerant flow systems
  • General ventilation
  • Building management system integration
  • Sanitaryware installation
  • Flushing and dosing of heating systems
  • Chlorination of domestic water systems
  • Testing, commissioning and seasonal commissioning
  • Operation and maintenance information and record drawings

Following installation, our team will undertake comprehensive testing and commissioning of the systems, including a complete handover documentation to ensure the facility is ready for safe and effective operation.

 

The outcome:

With Fusion 360’s support, Speller Metcalfe will be able to deliver a specialist electrical and mechanical installation, carried out within a live NHS environment.

With work now well underway, the new Hearing and Balance facility is expected to launch in November 2026, providing better care for those with hard of hearing around Leicester.

The electrical and mechanical scope represents a combined contract value of approximately £1.035 million.

 

“Fusion 360 have been a pleasure to work with and we have been especially impressed with how their team are managing the programme while maintaining a high quality of installation throughout the project. We look forward to moving into our new facility later this year!” – Project Manager at Speller Metcalfe